Bathroom Tap Pt. 3

I had finished all the prep work, and I was prepared to install the new water lines to my bathroom faucet (check out Pt. 2 if you missed it).

Throughout this project, I had many more trips in and out of the crawlspace than I am expressing. Also I took more trips to Home Depot than are written. I was so new to all of this, that I was taking one single step at a time (e.g. crawl down and take a measurement, come back up and check it, crawl back down and drill…) rather than compiling my steps into efficient groups.

Anyway, for my first time cutting the PEX, I used a utility knife with a new blade, and rolled the pipe as I made the cut. It worked decently well, but I did freshen the edges to get a nice smooth line sans burs.

Crimping was more challenging than cutting. Mainly because the crimping tool was bulky and the copper rings, that fit the half inch pipe, are quite small. However, in only a couple minutes, I had a proper length of PEX with an appropriately affixed brass adapter to connect to the water supply.

It wasn’t too long till I had both lines connected and up through the floor.

I thought I was home free at this point. I had all the hardware I needed to plug into the old faucet; two straight pipe to PEX valves, two new extension lines, even flanges to spruce up the holes for the PEX entering the bottom of the vanity. Just a few more minutes and I would be finished….

I’ll write the last bit of the story tomorrow.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.